Home Improvement Contract
Mikeโs Mobile, Inc. DBA: Den Defenders
CA Contractorโs License No. 939154
1401 West Fremont Street, Stockton, CA 95203
Phone: 877-520-3595 | www.dendefenders.com
ARTICLE 1. CONTRACT DOCUMENTSย
1.1 The contract documents consist of this Home Improvement Contract, the accepted Estimate, general conditions, specifications, finish schedules, construction draw schedule (if applicable), information disclosure statement, all addenda issued prior to execution of this Agreement, and all change orders or modifications agreed to in writing by both parties. These documents represent the entire agreement between the parties and supersede any prior oral or written agreements.ย
ARTICLE 2. SCOPE OF WORKย
2.1 Owner agrees to purchase and Contractor agrees to furnish, manufacture where applicable, and install the products and/or perform the work described in the accepted Estimate, including all materials, labor, and incidentals necessary to complete the installation in a good and workmanlike manner.ย
ARTICLE 3. TIME OF COMMENCEMENT AND COMPLETIONย
3.1 Estimated commencement dates after acceptance of the Estimate depend on material availability, supplier production schedules, custom fabrication requirements, and delivery timelines. Estimated lead times are as follows:ย
- Security Screen Doors: approximately 4โ16 weeksย
- Security Screen Windows: approximately 4โ16 weeksย
- Storm Doors: approximately 4โ16 weeksย
3.2 Contractor shall not be responsible for delays resulting from supplier production schedules, material shortages, shipping or delivery delays, labor disputes, governmental actions, Acts of God, weather conditions, Owner-caused delays, approved change orders, or other circumstances beyond Contractorโs reasonable control.
ARTICLE 4. CONTRACT PRICE, DEPOSITS, AND MATERIAL ADVANCESย
4.1 The Contract Price shall be the total amount stated in the accepted Estimate, subject to adjustments for approved change orders.ย
4.2 Standard Deposit Limitation. Except as expressly provided in Section 4.3 below, any deposit collected at the time of contract signing shall not exceed ten percent (10%) of the Contract Price or One Thousand Dollars ($1,000), whichever is less, in compliance with California Business & Professions Code ยง7159.ย
4.3 Custom or Special-Order Materials / Material Advance. Owner acknowledges that certain products sold by Contractor are custom-manufactured, special-order, or non-returnable and must be ordered specifically for Ownerโs project. Where such materials are required, Owner agrees to pay a material advance toward the actual cost of those materials. Any such material advance: (a) shall be limited to the documented cost invoiced by the manufacturer or supplier for the custom or special-order materials; (b) may be required prior to Contractor placing the order for such materials; and (c) is intended solely to cover the cost of custom or special-order materials and is not a general down payment for labor.ย
4.4 If third-party financing is approved for the full Contract Price, no deposit or material advance shall be required unless otherwise required by the financing provider.ย
ARTICLE 5. PAYMENT TERMS โ NO BILLINGย
5.1 Contractor does not offer billing, invoicing after completion, or deferred payment terms for installation projects. Payment in full is due immediately upon completion of the installation or delivery of the product, unless otherwise stated in a written financing agreement executed by Owner and a third-party financing provider.ย
5.2 Third-Party Financing Responsibility and Timing. If Owner elects to pay any portion of the Contract Price through a third-party financing provider, Owner is solely responsible for completing all required financing applications, documentation, and approvals. Owner agrees to submit all required financing paperwork and obtain financing approval within ten (10) calendar days of contract signing, unless a different timeframe is expressly agreed to in writing by Contractor.ย
5.3 If Owner fails to timely complete financing requirements or obtain approval within the required timeframe, Contractor may, at its option: (a) suspend ordering of materials or scheduling of installation; (b) treat the delay as an Owner-caused delay affecting project timelines; or (c) require payment in full by other means prior to proceeding with the work.ย
5.4 Failure to remit payment at the time of completion, or failure to timely secure financing as required herein, constitutes a material breach of this Agreement. Contractor may pursue all
remedies available by law, including suspension of warranty services, collection efforts, and recording of a mechanicsโ lien where permitted by law.ย
ARTICLE 6. PROGRESS PAYMENTS (WHEN APPLICABLE)ย
6.1 For projects requiring progress payments, Contractor shall provide Owner with a written construction draw schedule prior to commencement of work. Payments are due within three (3) calendar days of Contractorโs request once the applicable milestone is completed.ย
ARTICLE 7. DUTIES OF THE CONTRACTORย
7.1 Contractor shall perform all work in a good and workmanlike manner and in compliance with applicable state and local codes.ย
7.2 Contractor shall maintain all insurance required by law.ย
7.3 Upon receipt of payment for any portion of the work, Contractor shall provide an unconditional lien release for that portion of the work upon request.ย
ARTICLE 8. OWNER RESPONSIBILITIESย
8.1 Owner shall provide access to the property and shall communicate with subcontractors only through Contractor.ย
8.2 Owner shall pay all amounts due under this Agreement at the time required.
ARTICLE 9. CHANGE ORDERSย
9.1 All changes to the Scope of Work must be documented in a written Change Order signed by both parties prior to commencement of the changed work. Change Orders shall specify cost adjustments and any impact on the completion timeline.ย
ARTICLE 10. COLOR SELECTION ACKNOWLEDGMENTย
10.1 Owner acknowledges that all color selections are final once approved and submitted for manufacturing or ordering.ย
10.2 Owner understands and agrees that online images, printed materials, brochures, photographs, and digital renderings may not accurately represent final product colors due to lighting conditions, screen calibration, printing limitations, and material differences.
10.3 Owner agrees that physical color samples must be viewed in person prior to final approval. Contractor shall not be responsible for dissatisfaction or disputes arising from color selections approved without review of physical samples. Color selections may not be changed after approval.ย
ARTICLE 11. WARRANTYย
Den Defenders stands behind the quality of its products and workmanship. The following provisions explain how warranty coverage is administered and which warranty programs apply to Ownerโs project.ย
11.1 Warranty Administrationย
Den Defenders designs, manufactures, and installs custom security screen doors, security window screens, and related products using components sourced from qualified suppliers. Regardless of the original source of any individual component, Den Defenders shall remain Ownerโs sole point of contact for all warranty service provided under this Agreement. Owner shall not be required to contact any third-party supplier or manufacturer regarding warranty claims or service.ย
11.2 Applicable Warranty Coverageย
The warranties included with Ownerโs purchase are identified in the accepted Estimate, which is incorporated into this Agreement by reference. Only the warranty programs identified in the accepted Estimate apply to Ownerโs project. Unless otherwise stated, applicable warranty coverage begins upon substantial completion of installation.ย
Den Defenders warranty programs may include the following:ย
10-Year Workmanship Warrantyย
Unless otherwise stated in the accepted Estimate, Den Defendersโ standard 10-Year Workmanship Warranty covers defects resulting from installation or workmanship performed by Den Defenders.ย
Lifetime Break-In Protectionย
Where included in the accepted Estimate, qualifying Den Defenders security products include Lifetime Break-In Protection. If a covered security product is successfully breached during a forced break-in, Den Defenders will provide the applicable repair, replacement, or other benefit specified for that warranty program.ย
15-Year Premium Protection Planย
Where purchased or included as part of a promotion, the 15-Year Premium Protection Plan extends the standard 10-Year Workmanship Warranty to 15 years and includes house-settling protection. If normal structural settling causes a qualifying product to become misaligned or
unlevel during the warranty period, Den Defenders will professionally adjust and re-level the product at no additional cost.ย
11.3 Supplier Componentsย
Den Defenders manufactures its products using components and raw materials obtained from various suppliers, including, but not limited to, mesh, hardware, locking systems, aluminum extrusions, finishes, glass, thresholds, and related materials.ย
If a covered warranty issue involves a supplier-provided component, Den Defenders will administer any applicable supplier warranty or otherwise provide warranty service in accordance with the warranty coverage applicable to Ownerโs project. Owner shall not be required to pursue a claim directly with the supplier or manufacturer.ย
11.4 Warranty Serviceย
All warranty inspections, adjustments, repairs, and other warranty service shall be scheduled through Den Defenders and performed by Den Defenders or its authorized representatives.ย
Repairs, modifications, alterations, or replacement parts performed or installed by an unauthorized third party may void warranty coverage to the extent such work causes or contributes to the condition requiring service.ย
11.5 Warranty Exclusionsย
Unless expressly stated otherwise in the accepted Estimate or applicable warranty coverage, warranties do not cover conditions or damage resulting from:ย
- Abuse, misuse, neglect, or vandalism;ย
- Accidents, fire, flooding, earthquakes, severe weather, or other events beyond Den Defendersโ reasonable control;ย
- Normal cosmetic wear consistent with ordinary use;ย
- Improper operation or failure to follow reasonable care and maintenance instructions provided by Den Defenders;ย
- Unauthorized repairs, modifications, or alterations;ย
- Damage caused by third parties after installation;ย
- Damage caused by impacts or external forces, except where expressly covered by an applicable warranty program; orย
- Conditions unrelated to defects in materials or Den Defendersโ workmanship. 11.6 Material Availability and Supplier Delaysย
Owner acknowledges that Den Defenders manufactures custom products using materials and components obtained from various suppliers. Estimated project timelines are based on
anticipated material availability, supplier production schedules, custom fabrication requirements, and delivery timelines.ย
Den Defenders shall not be responsible for delays caused by material shortages, supplier production delays, shipping interruptions, labor disputes, governmental actions, discontinued or unavailable materials, Acts of God, or other circumstances beyond Den Defendersโ reasonable control.ย
Such delays shall not constitute a breach of this Agreement or a product defect and shall not, by themselves, entitle Owner to cancel this Agreement or recover damages, provided Den Defenders continues to perform its obligations within a commercially reasonable time.ย
11.7 Limitation of Warrantyย
The warranties identified in the accepted Estimate and described in this Agreement constitute the warranties provided by Den Defenders for the products and services covered by this Agreement.ย
Except for the warranties expressly provided in this Agreement and the accepted Estimate, Den Defenders makes no additional express or implied warranties, including warranties of merchantability or fitness for a particular purpose, except to the extent such warranties cannot legally be excluded or limited under applicable law.ย
ARTICLE 12. MECHANICSโ LIEN WARNINGย
MECHANICSโ LIEN WARNINGย
Anyone who helps improve your property but who is not paid may record what is called a mechanicsโ lien on your property. A mechanicsโ lien is a claim, like a mortgage or home equity loan, made against your property and recorded with the county recorder.ย
Even if you pay your contractor in full, unpaid subcontractors, suppliers, or laborers may record a mechanicsโ lien and foreclose the lien, which could result in the loss of your home.ย
To preserve your rights and protect your property, you may wish to:ย
- Require your contractor to provide you with lien releases from all subcontractors and suppliers for work performed and materials supplied.ย
- Make checks payable jointly to your contractor and the subcontractor or supplier. โ Use a payment service or escrow service to ensure that all parties are paid properly.ย
This notice is required by law and is provided for your protection.ย
ARTICLE 13. RIGHT TO CANCEL
13.1 You, the Buyer, have the right to cancel this contract without penalty or obligation within three (3) business days from the date you sign it.ย
13.2 If you are 65 years of age or older, you have the right to cancel this contract within five (5) business days from the date you sign it.ย
13.3 To cancel, Buyer must deliver written notice of cancellation to Contractor at Contractorโs place of business before midnight of the applicable cancellation period.ย
13.4 If Buyer cancels, Contractor shall return all payments made by Buyer within ten (10) days of receipt of the cancellation notice, and any security interest arising from this transaction shall be cancelled.ย
ARTICLE 14. ARBITRATION OF DISPUTESย
14.1 Any controversy or claim arising out of or relating to this Contract, the performance of the work, or the interpretation of this Contract shall be resolved by binding arbitration in accordance with the California Arbitration Act (Code of Civil Procedure ยง1281 et seq.).ย
14.2 The arbitration shall be conducted in the county where the Project is located unless the parties agree otherwise in writing. Judgment upon the arbitration award may be entered in any court having jurisdiction.ย
14.3 The arbitrator shall have the authority to award any remedy permitted by law. The prevailing party shall be entitled to recover reasonable attorneyโs fees, costs, and expenses incurred in connection with the arbitration.ย
14.4 By initialing this section, Owner and Contractor acknowledge that they are waiving the right to a jury trial and agree that arbitration shall be the exclusive forum for resolving disputes arising under this Contract, except where provisional remedies or mechanicsโ lien rights are pursued as permitted by law.ย
ARTICLE 15. CONTRACTORโS LICENSE NOTICEย
15.1 Contractors are required by law to be licensed and regulated by the Contractorsโ State License Board (CSLB). Any questions concerning a contractor may be referred to the CSLB at P.O. Box 26000, Sacramento, CA 95826 or www.cslb.ca.gov.ย
ARTICLE 16. ACCEPTANCEย
By signing below, Owner acknowledges receipt of this Home Improvement Contract, including the Mechanicsโ Lien Warning and Three-Day Right to Cancel Notice, and agrees to all terms herein.
Made In USA
Lifetime No-Break-In Warranty
Financing Options
Premium security doors and security screens – custom build and professionally installed.
Get premium home security solutions including, security screen doors, storm doors, and security screens.
Products
Service Areas
Den Defenders Security Doors | Licensed | Bonded | Insured | #939154 | Privacy Policy